---
title: "Before You Collect Your Keys | Rooftop Interior Design"
description: "Getting the keys to a new home in Johor Bahru? Why we suggest talking to an interior designer 3 to 6 months before handover, and what to prepare."
url: https://www.rooftopinteriordesign.my/before-handover/
lang: en
---

![A child at the timber blinds in the living room at Eco Flora](/img/remy-02.webp)

The Curated HomeEco Flora

# Before you collect your keys

We suggest getting in touch 3 to 6 months before you collect your keys. That gives enough time to plan properly, so work can start soon after handover instead of months later.

## Why start before you have the keys

-   Planning takes time. A first layout, a moodboard, revisions, 3D drawings and a full quotation each need a round of discussion with you.
-   Your floor plan is enough to begin. We do not need to be inside the unit to start on the first layout.
-   When the design and quotation are settled before handover, work can begin sooner and you move in sooner.

## What to prepare

-   Your floor plan from the developer or sales gallery.
-   Your expected key collection date.
-   Who will live there, and the daily habits that matter to you: cooking, working from home, children, things you collect.

[See our 5-step process](/process/)

## At handover: what to check

To be added: the defects Rooftop Interior Design most often finds at handover inspection, in their own words.

Collecting your keys in 3 to 6 months?

Send us your floor plan, and roughly when you get the keys. [WhatsApp 019-904 5212](https://wa.me/60199045212?text=Hi%20Rooftop%20Interior%20Design%2C%20I%20am%20collecting%20my%20keys%20soon.%0AProperty%20%2F%20area%3A%0AExpected%20key%20date%3A)
