Before you collect your keys
We suggest getting in touch 3 to 6 months before you collect your keys. That gives enough time to plan properly, so work can start soon after handover instead of months later.
Why start before you have the keys
- Planning takes time. A first layout, a moodboard, revisions, 3D drawings and a full quotation each need a round of discussion with you.
- Your floor plan is enough to begin. We do not need to be inside the unit to start on the first layout.
- When the design and quotation are settled before handover, work can begin sooner and you move in sooner.
What to prepare
- Your floor plan from the developer or sales gallery.
- Your expected key collection date.
- Who will live there, and the daily habits that matter to you: cooking, working from home, children, things you collect.
At handover: what to check
To be added: the defects Rooftop Interior Design most often finds at handover inspection, in their own words.